FPSO Turret & Gantry Project

Client Case Study: ENG-CAD were responsible for the conceptual and detailed design of all of the Process and Utility pipework starting from the riser terminations on the geo-stationary side, terminating at the main pipe rack tie-ins situated on the vessel main deck (rotating side).

Water Treatment Modules (QUAD 204)

Client Case Study: ENG-CAD’s involvements with this project were 5 different Water Treatment Packages, structural design and analysis was carried out on all of the packages, along with a full pipe stress analysis. Detailed fabrication drawings were also produced.