Replacement Accumulator & Reboiler

Due to the age of some of the existing plant at the Bacton Gas Terminal, ENG-CAD has regularly been presented with the task of providing the necessary information required to replace these items.

As an example, on one of the sites the survey team have carried out on-site dimensional control surveys on the existing accumulator and re-boiler assemblies. Reports were then produced which were followed by fabrication detail and assembly drawings for the plant replacement, including associated pipework that has been affected by the change.