
Offshore Access Bridge
ENG-CAD have been involved in offshore access bridges in many different capacities, whether it be modifying an existing bridge, providing structural analysis for re-certification of an existing bridge or to design, detail and fabricate a new one.
The one shown on the left is a 20 metre access bridge that was designed and detailed on behalf of AJS Great Yarmouth. The bridge was manufactured for use in the North Sea Southern Sector for Shell UK, initially for use during shutdown & maintenance campaigns on the ‘Upgrade Project’ in conjunction with jack-ups such as Seafox 4.


More Case Studies:
Containerised Cargo Lifting Frames
Client Case Study: ENG-CAD has extensive experience designing and detailing a wide range of containers, baskets and lifting frames certified for offshore lifting purposes.
Inde Field Decommissioning
Client Case Study: The Inde Field Decommissioning project utilised ENG-CAD’s Engineering, Structural Design and Surveying services.
Crane Operator contracted to new-build Biomass project
Client Case Study: ENG-CAD Resource Solutions supply crane operator to new-build Biomass project.
ENG-CAD provide independent procedure review
Client Case Study: ENG-CAD Resource Solutions provide independent procedure review.
Electrical personnel mobilised to Danish Windfarm
Client Case Study: ENG-CAD Resource Solutions mobilise electrical personnel to Danish windfarm.
Team supplied for secondary and tertiary fabrication
Client Case Study: ENG-CAD Resource Solutions supply team for secondary and tertiary fabrication.