High Level Walkways & Stair Tower

ENG-CAD were awarded the task of providing a feasibility study of providing high-level adjoining access walkways for 3 scrubber platforms that sat alongside a compressor building at a Bacton Gas Terminal. The study had to take into account the handling and installation of the steel work over a complex arrangement of pipework & equipment.

Following the successful completion of the study, ENG-CAD was given the contract to undertake a full design of the walkways & stair tower, providing structural calculations & fabrication/assembly drawings, as well as liaising and assisting the approved fabrication contractor during both fabrication and installation phases.