Electrical personnel mobilised to Danish Windfarm
ENG-CAD was commissioned by a leading marine and renewable energy consultancy to provide Electrical personnel to the Amrumbank Windfarm in Denmark.
This was to facilitate a last minute request from our client to have a team of competent and qualified Electrical personnel with Rope Access, Working at Height and a full suite of GWO credentials.
The Electrical team was mobilised for two offshore assignments to install MCC equipment and undertake other electrical duties as required by Site Management.
ENG-CAD continues to support the client on an ad-hoc basis having complimented the first technicians for a “can-do attitude”.

Resource Solutions Case Studies:
Crane Operator contracted to new-build Biomass project
Client Case Study: ENG-CAD Resource Solutions supply crane operator to new-build Biomass project.
read moreENG-CAD provide independent procedure review
Client Case Study: ENG-CAD Resource Solutions provide independent procedure review.
read moreTeam supplied for secondary and tertiary fabrication
Client Case Study: ENG-CAD Resource Solutions supply team for secondary and tertiary fabrication.
read moreResources deployed within 24 hours
Client Case Study: A major offshore terminal operator required a CSWIP 3.2 Senior Welding Inspector and a team of 6G GTAW Welders. ENG-CAD’s Resource Solutions dept. had them mobilized in under 24 hours.
read more