Crane Operator contracted to new-build Biomass project
To support the construction of a new build Renewable Energy Plant, ENG-CAD has provided Crane Operators at short notice to assist with the construction and installation of an air condensed cooler (ACC) unit.
A CPCS Blue Card approved Crane Operator supplied by ENG-CAD attended an inspection and familiarisation on the site crane, prior to mobilisation to site for a long term assignment.
This is an ongoing requirement supporting an overseas client in the installation of a flagship UK project, which ENG-CAD are proud to have involvement with.
ENG-Cad continues to support the requirements of our client through the provision of competent, qualified and experienced personnel across a range of disciplines including Steel Erection, Rigging, Assembly, Welding and Pipefitting / Installation.
Resource Solutions Case Studies:
ENG-CAD provide independent procedure review
Client Case Study: ENG-CAD Resource Solutions provide independent procedure review.
Electrical personnel mobilised to Danish Windfarm
Client Case Study: ENG-CAD Resource Solutions mobilise electrical personnel to Danish windfarm.
Team supplied for secondary and tertiary fabrication
Client Case Study: ENG-CAD Resource Solutions supply team for secondary and tertiary fabrication.
Resources deployed within 24 hours
Client Case Study: A major offshore terminal operator required a CSWIP 3.2 Senior Welding Inspector and a team of 6G GTAW Welders. ENG-CAD’s Resource Solutions dept. had them mobilized in under 24 hours.